New FP centrifugal loading pump

After testing the new pump, we can conclude that it lives up to expectations. Below you will find more information and videos showing the pump in action.

 

  • Loading time 400 bar: 2min 20sec (40.500 l tank level with terrain)
  • Loading time 300 bar: 2min 40sec (40.500 l tank level with terrain)
  • Produced in stainless steel
  • Rolled bottom part for added strength
  • No vibrations (see video below)
  • Minimum resistance during unloading
FP l├Žssepumpe 
  • Billede1
  • Billede2
  • Billede3
 

Loading

Note that there are almost no viewable vibrations, even though the pump is running at 400 bar.

Unloading

Due to the increased passage in the pump housing there is minimum resistance during unloading.

 

News

New FP centrifugal pump

We have now tested our new centrifugal pump with excellent results. The pump was tested at different pressure on a 40,500 liter tank trailer. Click here to read more and watch videos of the pump in action.

Ny FP l├Žssepumpe

 

Collaboration with MidtTank A/S

We have made a partnership with MidtTank A/S regarding the sale of tank trailers. The tank trailers are of the brand G. MAGYAR, which is a French manufacturer with many years of experience and produces more than 1,200 trucks per year.

Contact Information

FP production ApS
Odinsvej 21
7200 Grindsted, Denmark
Tel.: +45 75 31 01 06
Mob.: +45 21 42 11 06
Fax: +45 75 31 01 78
CVR: 13930775
This email address is being protected from spambots. You need JavaScript enabled to view it.