New FP centrifugal loading pump

After testing the new pump, we can conclude that it lives up to expectations. Below you will find more information and videos showing the pump in action.

 

  • Loading time 400 bar: 2min 20sec (40.500 l tank level with terrain)
  • Loading time 300 bar: 2min 40sec (40.500 l tank level with terrain)
  • Produced in stainless steel
  • Rolled bottom part for added strength
  • No vibrations (see video below)
  • Minimum resistance during unloading
FP læssepumpe 
  • Billede1
  • Billede2
  • Billede3
 

Loading

Note that there are almost no viewable vibrations, even though the pump is running at 400 bar.

Unloading

Due to the increased passage in the pump housing there is minimum resistance during unloading.

 

News

Ny FP-centrifugalpumpe

Vi har nu testet vores nye centrifugalpumpe med fremragende resultater. Pumpen blev testet ved forskningsartikler på en 40.500 liter tankvogn. Klik her for  at læse mere og se videoer af pumpe i aktion.

Ny FP læssepumpe

 

Samarbejde med MidtTank A / S

Vi har indgået og partnerskab med MidtTank A / S om salg af tankvogne. Tankvogne er af mærket G. MAGYAR, der er en fransk producent med mange års erfaring og produktcent blot 1.200 lastbiler om året.AAA

Contact Information

FP production ApS
Odinsvej 21
7200 Grindsted, Denmark
Tel.: +45 75 31 01 06
Mob.: +45 21 42 11 06
Fax: +45 75 31 01 78
CVR: 13930775
This email address is being protected from spambots. You need JavaScript enabled to view it.